Home | Login | Contact Us | Organogram | Feedback |
    SEARCH
You are here: Home | Bulk Infrastructure Development | » View Printer Friendly VersionExport to MS-ExcelExport to MS-WordOrientate yourself using a mapLogin here
»
Select Perspective
 
 
»
Profiles
 
»
Municipal Search
 
 

This allows you to do a search for a specific Municipality Advanced search... 

This allows you to do a search for a specific record or filter the list of displayed records using regions or alphabeticallyFind/Filter Menu...

»
Reports
 
 

This allows you to do a search for a specific recordReport list...

»
Acts, Policies & Strategies
Access the Strategic Assessment for Water Services (SAWS) Website SAWS
Access the WS Policy Database Website WS Policy Database
This allows you to do a search for a specific recordCategorised list...
 
bullet WS NIS Administrator only (login)
Version: 4.0
Site visitors: 293635 Visitors293635 Visitors293635 Visitors293635 Visitors293635 Visitors293635 Visitors

Manage Project for Implementation:

ID Prov DM LM WSA Project Number Project Name Project Phase Description Motivation Pop-Water-Basic Pop-Water-Higher Pop-Water-System Improvement Water-Total (Rand) Pop-San-Basic Pop-San-Higher Pop-San-System Improvement San-Total (Rand) Total (Rand) Main Infra Type New/Existing/Refurb Project Size Qualifies (Y/N) Project Type Feasibility Status Feasibility Cost Priority Implementation Readiness Implementation Time Frame (yrs)
1 EC Ukhahlamba DC14/001 Lady Grey Bulk Water Supply Lady Grey Augment borehole Scheme 5438 417220.875 417220.875 Raw Water Bulk Refurb Existing small ( 10430.5219
2 EC Ukhahlamba DC14/001 Lady Grey Bulk Water Supply Telemetry integration of Lady Grey Water Purification Plant 7195 110000 110000 Internal Bulk Refurb Existing small ( 2750
3 EC Ukhahlamba DC14/002 Rhodes Bulk Water Supply Rhodes: Augmentation of river supply from existing weir 500 322000 322000 Raw Water Bulk Refurb Existing small ( 8050
4 EC Ukhahlamba DC14/002 Rhodes Bulk Water Supply Telemetry integration of Rhodes to Senqu system 377 162000 162000 Internal Bulk Refurb Existing small ( 4050
5 EC Ukhahlamba DC14/003 Barkly East Raw Water Abstraction & WTW Upgrade Barkley East: Reconfigure abstraction pipework and refurbish pumpstation and pipework 270000 270000 Raw Water Bulk Refurb Existing small ( 6750
6 EC Ukhahlamba DC14/003 Barkly East Raw Water Abstraction & WTW Upgrade Barkley East: Civil, Mechanical & Electrical refurbishment of existing treatment plant 350000 350000 Internal Bulk Extend Existing small ( 8750
7 EC Ukhahlamba DC14/004 Sterkspruit Bulk Water Supply Infrastructure Electrical protection of existing switchgear at high lift pump station (already out to tender but funding not yet confirmed) The treatment plant has a design capacity of 6,6 Ml although it currently treats in the order of 8,2 to 8,7 Ml/day (winter demands). This figure is currently limited by the high lift pump station in which both pumps have to pump in parallel (without any standby) to meet the demands. As presented to your office and Senqu Local Municipality bottlenecks further exist on both the bulk supply to Herschel and Voyizana and is enhanced by the housing developments being implemented and further planned in these areas. The contract for the bulk metering in Sterkspruit was awarded for a reduced amount due to limited funds and can merely be extended to the original scope should additional funds be made available. Tenders have been called for the electrical refurbishment of the transfer 112365 199485 199485 External Potable Bulk Refurb Existing small ( 4987.125
8 EC Ukhahlamba DC14/004 Sterkspruit Bulk Water Supply Infrastructure Upgrading of high lift pump station 0 External Potable Bulk Extend Existing small ( 0
9 EC Ukhahlamba DC14/004 Sterkspruit Bulk Water Supply Infrastructure - Mechanical work 694980 694980 External Potable Bulk Extend Existing small ( 17374.5
10 EC Ukhahlamba DC14/004 Sterkspruit Bulk Water Supply Infrastructure - Electrical work 424710 424710 External Potable Bulk Extend Existing small ( 10617.75
11 EC Ukhahlamba DC14/004 Sterkspruit Bulk Water Supply Infrastructure Refurbishment work to convert transfer diesel pumpstations to Eskom supply 347000 347000 External Potable Bulk Refurb Existing small ( 8675
12 EC Ukhahlamba DC14/005 Sterkspruit Treatment Plant Replace existing (6,6 Ml) pressure filters 3861000 3861000 External Potable Bulk Extend Existing medium (R10m-R50m) 69498
13 EC Ukhahlamba DC14/005 Sterkspruit Treatment Plant Extend capacity of works to 12 Ml (equal to water allocation) 11583000 11583000 External Potable Bulk Extend Existing medium (R10m-R50m) 208494
14 EC Ukhahlamba DC14/006 Sterkspruit Bulk Supply Mains Upgrade bulk supply to South Western Villages (Herschel) 5020300 5020300 Internal Bulk Extend Existing small ( 125507.5
15 EC Ukhahlamba DC14/006 Sterkspruit Bulk Supply Mains Upgrade bottleneck in supply tp Mlamli & Voizana 2450000 2450000 Internal Bulk Extend Existing small ( 61250
16 EC Ukhahlamba DC14/006 Sterkspruit Bulk Supply Mains Telemetry Control of Scheme 740000 740000 Internal Bulk Extend Existing small ( 18500
17 EC O R Tambo C/EC0956/W/02/05 O.R. Tambo: Sidwadweni - Regional Water Supply 109 15000000 15000000 External Potable Bulk Refurb Existing medium (R10m-R50m) 270000
18 EC O R Tambo C/EC1195/W/04/05 Port St Johns: Regional Water Supply Scheme 3327 5000000 5000000 External Potable Bulk Refurb Existing small ( 125000
19 EC O R Tambo C/ECDC15/069/W/06/07 Ext of PSJ Regional Scheme 12 & 13 31459 5500000 5500000 External Potable Bulk Refurb Existing small ( 137500
20 EC O R Tambo C/ECDC15/087/W/06/07 Mkambati Regional (Spes Bona Weir)(Ward23,22,20,19,18) Mkambati Regional Scheme would be based on the Spes Bona Weir on the Mtentu River and the Mbongweni Weir on the Mzamba River. This has the potential to serve 110 000 people in 83 villages including a large area of Mbizana District. 25196 7000000 7000000 External Potable Bulk Refurb Existing small ( 175000
21 EC O R Tambo C/ECDC15/088/W/06/07 Flagstaff Regional W/S ward 11,5,17 and part of 6 (Mzintlana River) Mzintlava River Scheme would abstract from the Mzintlava River near Ntabankulu town and would be able to supply Wards 1, 2, 3, 6, 7 and portions of Wards 4, 7 and 9. Ward 5 and the balance of Ward 4 can be served by the existing Mnceba scheme which requires rehabilitation 51076 5000000 5000000 Internal Bulk small ( 125000
22 EC O R Tambo C/ECDC15/089/W/06/07 Flagstaff Regional W/S (ward8,9,10,6) Bala Weir 42730 5000000 5000000 Raw Water Bulk Refurb Existing small ( 125000
23 EC O R Tambo EC532 Bizana Raw Water Augmentation Scheme 18099 10000000 10000000 Raw Water Bulk Refurb Existing small ( 250000
24 EC O R Tambo C/EC0485/S/02/05 KSD: Umtata: Northern Outfall Sewers 3845 5000000 5000000 Internal Bulk small ( 125000
25 EC O R Tambo C/EC1181/S/03/04 KSD: Umtata - Waste Water Treatment Works 3845 10000000 10000000 Internal Bulk small ( 250000
26 EC Alfred Nzo DC44/001 Kwabaca Bulk Scheme Refurbish of a raw water pipe. Build raw water reservoir with at least 67 days storage. Build intermidiate booster pump station. Upgrading of water treatment works. Current water scheme needs to be upgraded to cope with inceasing population demand coused by economic and social standards 20000000 20000000 Raw Water Bulk Extend Existing medium (R10m-R50m) 360000
27 EC Alfred Nzo DC44/003 Regional Dam Construction of Regional Dam between Matatiele and Mount Ayliff Alfred Nzo DM has baclog to eradicate on water since most of our communities still don't have access to potable water 18985000 18985000 Raw Water Bulk New medium (R10m-R50m) 341730
28 EC Buffalo City EC125/001 Coastal Bulk Mdantsane PS2 - 2 x New Motors & Starters Deferred Maintenance 208620 208620 External Potable Bulk Refurb Existing small ( 5215.5
29 EC Buffalo City EC125/001 Coastal Bulk Mdantsane PS2 - Refurbish Pump 5 Deferred Maintenance 104310 104310 External Potable Bulk Refurb Existing small ( 2607.75
30 EC Buffalo City EC125/001 Coastal Bulk Mdantsane PS1 - Refurbish Motor Deferred Maintenance 83448 83448 External Potable Bulk Refurb Existing small ( 2086.2
31 EC Buffalo City EC125/001 Coastal Bulk Umzoniana & BRPS HT Upgrade Deferred Maintenance 730170 730170 External Potable Bulk Extend Existing small ( 18254.25
32 EC Buffalo City EC125/001 Coastal Bulk 2 x 160 uPVC Pipelines for Sludge (2,5 km) Deferred Maintenance 2500000 2500000 External Potable Bulk Refurb Existing small ( 62500
33 EC Buffalo City EC125/001 Coastal Bulk 2 x New Pump Sets - Reclamation Station Deferred Maintenance 219051 219051 External Potable Bulk Refurb Existing small ( 5476.275
34 EC Buffalo City EC125/001 Coastal Bulk Ammonia Room Upgrade Deferred Maintenance 176000 176000 External Potable Bulk Extend Existing small ( 4400
35 EC Buffalo City EC125/001 Coastal Bulk 4 x Air Valves - BRPS Rising Main Deferred Maintenance 204100 204100 External Potable Bulk Refurb Existing small ( 5102.5
36 EC Buffalo City EC125/001 Coastal Bulk Umzoniana Dam Wall Maintenance Deferred Maintenance 139452 139452 External Potable Bulk Refurb Existing small ( 3486.3
37 EC Buffalo City EC125/001 Coastal Bulk Building Maintenance Deferred Maintenance 1100000 1100000 External Potable Bulk Refurb Existing small ( 27500
38 EC Buffalo City EC125/001 Coastal Bulk New Staff Changerooms Deferred Maintenance 100000 100000 External Potable Bulk Refurb Existing small ( 2500
39 EC Buffalo City EC125/001 Coastal Bulk 4 x Magflows - Sedimentation Tanks Deferred Maintenance 166896 166896 External Potable Bulk Refurb Existing small ( 4172.4
40 EC Buffalo City EC125/001 Coastal Bulk 6 x Magflows - Dawn & Fort Grey Rising Mains Deferred Maintenance 260775 260775 External Potable Bulk Refurb Existing small ( 6519.375
41 EC Buffalo City EC125/001 Coastal Bulk Recondition Gearboxes - Sedimentation Tanks Deferred Maintenance 33100 33100 External Potable Bulk Refurb Existing small ( 827.5
42 EC Buffalo City EC125/001 Coastal Bulk Chains, Belts & Pulleys - Sedimetation Tanks Deferred Maintenance 33100 33100 External Potable Bulk Refurb Existing small ( 827.5
43 EC Buffalo City EC125/001 Coastal Bulk Laboratory Equipment Deferred Maintenance 150000 150000 External Potable Bulk Refurb Existing small ( 3750
44 EC Buffalo City EC125/001 Coastal Bulk Filter Media (Sand & Anthracite) Deferred Maintenance 210000 210000 External Potable Bulk Refurb Existing small ( 5250
45 EC Buffalo City EC125/001 Coastal Bulk BRPS Motor 3 - Bearings Deferred Maintenance 14310 14310 External Potable Bulk Refurb Existing small ( 357.75
46 EC Buffalo City EC125/001 Coastal Bulk BRPS - 5 x Isolating Valves Deferred Maintenance 766500 766500 External Potable Bulk Refurb Existing small ( 19162.5
47 EC Buffalo City EC125/001 Coastal Bulk Reservoirs 1 & 2 Ultrasonics Deferred Maintenance 52155 52155 External Potable Bulk Refurb Existing small ( 1303.875
48 EC Buffalo City EC125/001 Coastal Bulk Pump Station Refurbishment Deferred Maintenance 75000 75000 External Potable Bulk Refurb Existing small ( 1875
49 EC Buffalo City EC125/001 Coastal Bulk Dams Deferred Maintenance 70000 70000 External Potable Bulk Refurb Existing small ( 1750
50 EC Buffalo City EC125/001 Coastal Bulk Chlorine Lifting Beam Deferred Maintenance 40000 40000 External Potable Bulk Refurb Existing small ( 1000
51 EC Buffalo City EC125/001 Coastal Bulk Air Valves Deferred Maintenance 160000 160000 External Potable Bulk Refurb Existing small ( 4000
52 EC Buffalo City EC125/001 Coastal Bulk Compressor Maintenance Deferred Maintenance 20000 20000 External Potable Bulk Refurb Existing small ( 500
53 EC Buffalo City EC125/002 Coastal Distribution Pumpsets Deferred Maintenance 500000 500000 External Potable Bulk Refurb Existing medium (R10m-R50m) 9000
54 EC Buffalo City EC125/002 Coastal Distribution Reservoirs Deferred Maintenance 1100000 1100000 External Potable Bulk Refurb Existing medium (R10m-R50m) 19800
55 EC Buffalo City EC125/002 Coastal Distribution Air Valve Replacement Deferred Maintenance 600000 600000 External Potable Bulk Refurb Existing medium (R10m-R50m) 10800
56 EC Buffalo City EC125/002 Coastal Distribution Isolating Valves Deferred Maintenance 300000 300000 External Potable Bulk Refurb Existing medium (R10m-R50m) 5400
57 EC Buffalo City EC125/002 Coastal Distribution Steel Trunk Main Refurbishment Deferred Maintenance 2000000 2000000 External Potable Bulk Refurb Existing medium (R10m-R50m) 36000
58 EC Buffalo City EC125/002 Coastal Distribution Control Valve Replacement Deferred Maintenance 300000 300000 External Potable Bulk Refurb Existing medium (R10m-R50m) 5400
59 EC Buffalo City EC125/002 Coastal Distribution Pressure Reducing Valves Deferred Maintenance 200000 200000 External Potable Bulk Refurb Existing medium (R10m-R50m) 3600
60 EC Buffalo City EC125/002 Coastal Distribution Pipeline Track Clearing Deferred Maintenance 200000 200000 External Potable Bulk Refurb Existing medium (R10m-R50m) 3600
61 EC Buffalo City EC125/002 Coastal Distribution Building Maintenance Deferred Maintenance 150000 150000 External Potable Bulk Refurb Existing medium (R10m-R50m) 2700
62 EC Buffalo City EC125/002 Coastal Distribution Distribution Mains Replacements Deferred Maintenance 8000000 8000000 External Potable Bulk Refurb Existing medium (R10m-R50m) 144000
63 EC Buffalo City EC125/002 Coastal Distribution Hydrant Repalcement Deferred Maintenance 80000 80000 External Potable Bulk Refurb Existing medium (R10m-R50m) 1440
64 EC Buffalo City EC125/002 Coastal Distribution Meter Replacement Deferred Maintenance 1950000 1950000 External Potable Bulk Refurb Existing medium (R10m-R50m) 35100
65 EC Buffalo City EC125/003 Midland Bulk Tunnel Inspection - Bridle Drift Dam Deferred Maintenance 1000000 1000000 External Potable Bulk Refurb Existing small ( 25000
66 EC Buffalo City EC125/003 Midland Bulk Refurbish Valves - Bridle Drift Dam Deferred Maintenance 71000 71000 External Potable Bulk Refurb Existing small ( 1775
67 EC Buffalo City EC125/003 Midland Bulk Wall Maintenance - Bridle Drift Dam Deferred Maintenance 300000 300000 External Potable Bulk Refurb Existing small ( 7500
68 EC Buffalo City EC125/003 Midland Bulk Wall Survey - Bridle Drift Dam Deferred Maintenance 50000 50000 External Potable Bulk Refurb Existing small ( 1250
69 EC Buffalo City EC125/003 Midland Bulk Upgrade Access Road to Bridle Drift Dam Deferred Maintenance 543000 543000 External Potable Bulk Extend Existing small ( 13575
70 EC Buffalo City EC125/003 Midland Bulk Refurbish Pumps - Cuttings Deferred Maintenance 39200 39200 External Potable Bulk Refurb Existing small ( 980
71 EC Buffalo City EC125/003 Midland Bulk Refurbish Pumps - Berlin Deferred Maintenance 12750 12750 External Potable Bulk Refurb Existing small ( 318.75
72 EC Buffalo City EC125/003 Midland Bulk Maintenance Pumps - Outspan Deferred Maintenance 39200 39200 External Potable Bulk Refurb Existing small ( 980
73 EC Buffalo City EC125/003 Midland Bulk Renew Switchgear Deferred Maintenance 15200 15200 External Potable Bulk Refurb Existing small ( 380
74 EC Buffalo City EC125/003 Midland Bulk 500 KVA Transformer - Cuttings Deferred Maintenance 113000 113000 External Potable Bulk Refurb Existing small ( 2825
75 EC Buffalo City EC125/003 Midland Bulk Bulk Mains Maintenance Deferred Maintenance 510000 510000 External Potable Bulk Refurb Existing small ( 12750
76 EC Buffalo City EC125/004 Midland Distribution Pumpsets Deferred Maintenance 500000 500000 External Potable Bulk Refurb Existing medium (R10m-R50m) 9000
77 EC Buffalo City EC125/004 Midland Distribution Reservoirs Deferred Maintenance 1100000 1100000 External Potable Bulk Refurb Existing medium (R10m-R50m) 19800
78 EC Buffalo City EC125/004 Midland Distribution Air Valve Replacement Deferred Maintenance 700000 700000 External Potable Bulk Refurb Existing medium (R10m-R50m) 12600
79 EC Buffalo City EC125/004 Midland Distribution Isolating Valves Deferred Maintenance 300000 300000 External Potable Bulk Refurb Existing medium (R10m-R50m) 5400
80 EC Buffalo City EC125/004 Midland Distribution Control Valve Replacement Deferred Maintenance 300000 300000 External Potable Bulk Refurb Existing medium (R10m-R50m) 5400
81 EC Buffalo City EC125/004 Midland Distribution Pressure Reducing Valves Deferred Maintenance 200000 200000 External Potable Bulk Refurb Existing medium (R10m-R50m) 3600
82 EC Buffalo City EC125/004 Midland Distribution Pipeline Track Clearing Deferred Maintenance 200000 200000 External Potable Bulk Refurb Existing medium (R10m-R50m) 3600
83 EC Buffalo City EC125/004 Midland Distribution Building Maintenance Deferred Maintenance 150000 150000 External Potable Bulk Refurb Existing medium (R10m-R50m) 2700
84 EC Buffalo City EC125/004 Midland Distribution Distribution Mains Replacements Deferred Maintenance 8000000 8000000 External Potable Bulk Refurb Existing medium (R10m-R50m) 144000
85 EC Buffalo City EC125/004 Midland Distribution Hydrant Repalcement Deferred Maintenance 80000 80000 External Potable Bulk Refurb Existing medium (R10m-R50m) 1440
86 EC Buffalo City EC125/004 Midland Distribution Meter Replacement Deferred Maintenance 1950000 1950000 External Potable Bulk Refurb Existing medium (R10m-R50m) 35100
87 EC Buffalo City EC125/005 Inland Bulk Inlet Works Deferred Maintenance 535500 535500 External Potable Bulk Refurb Existing medium (R10m-R50m) 9639
88 EC Buffalo City EC125/005 Inland Bulk Sedimantation Tanks Deferred Maintenance 98500 98500 External Potable Bulk Refurb Existing medium (R10m-R50m) 1773
89 EC Buffalo City EC125/005 Inland Bulk Filters Deferred Maintenance 339500 339500 External Potable Bulk Refurb Existing medium (R10m-R50m) 6111
90 EC Buffalo City EC125/005 Inland Bulk High Level Pump Station Deferred Maintenance 258500 258500 External Potable Bulk Refurb Existing medium (R10m-R50m) 4653
91 EC Buffalo City EC125/005 Inland Bulk Low Level Reservoirs Deferred Maintenance 85500 85500 External Potable Bulk Refurb Existing medium (R10m-R50m) 1539
92 EC Buffalo City EC125/005 Inland Bulk Dosing Rooms Deferred Maintenance 25000 25000 External Potable Bulk Refurb Existing medium (R10m-R50m) 450
93 EC Buffalo City EC125/005 Inland Bulk Buildings Deferred Maintenance 84000 84000 External Potable Bulk Refurb Existing medium (R10m-R50m) 1512
94 EC Buffalo City EC125/005 Inland Bulk Security Deferred Maintenance 35000 35000 External Potable Bulk Refurb Existing medium (R10m-R50m) 630
95 EC Buffalo City EC125/005 Inland Bulk Buildings - Maden Dam Deferred Maintenance 29000 29000 External Potable Bulk Refurb Existing medium (R10m-R50m) 522
96 EC Buffalo City EC125/005 Inland Bulk Maden Dam Wall, Outlet Works & 23 km Pipeline Deferred Maintenance 13920500 13920500 External Potable Bulk Refurb Existing medium (R10m-R50m) 250569
97 EC Buffalo City EC125/005 Inland Bulk Maden Dam Picnic Area & Roads Deferred Maintenance 141000 141000 External Potable Bulk Refurb Existing medium (R10m-R50m) 2538
98 EC Buffalo City EC125/006 Inland Distribution Reservoirs Deferred Maintenance 13098600 13098600 External Potable Bulk Refurb Existing large (R50m-R200m) 65493
99 EC Buffalo City EC125/006 Inland Distribution Pump Stations Deferred Maintenance 1963190 1963190 External Potable Bulk Refurb Existing large (R50m-R200m) 9815.95
100 EC Buffalo City EC125/006 Inland Distribution Bhisho Office Deferred Maintenance 159000 159000 External Potable Bulk Refurb Existing large (R50m-R200m) 795
101 EC Buffalo City EC125/006 Inland Distribution Bhisho Depot Deferred Maintenance 391600 391600 External Potable Bulk Refurb Existing large (R50m-R200m) 1958
102 EC Buffalo City EC125/006 Inland Distribution Inland Distribution Reticulation Deferred Maintenance 97356983 97356983 External Potable Bulk Refurb Existing large (R50m-R200m) 486784.915
103 EC Buffalo City EC125/007 Upgrade Gonubie WWTW Single Phase - Upgrade by 9ML/day Unlock housing development/ increase rates base 50000 0 External Potable Bulk Extend Existing 0
104 EC Buffalo City EC125/008 Quinera Interceptor Single Phase Unlock housing development/ increase rates base 50000 0 External Potable Bulk 0
105 EC Buffalo City EC125/009 Regional WWTW KingwilliamsTown Single Phase - Upgrade to 25ML/day Close down 3 dysfunctional works not meeting permit and unlock housing 175000 0 External Potable Bulk Extend Existing 0
106 EC Buffalo City EC125/010 Ancillary Interceptor Sewers KWT Regional Works Phase 1 - Schornville to Regional Works Inflows from decommissioned works to new regional works 105000 0 External Potable Bulk 0
107 EC Buffalo City EC125/010 Ancillary Interceptor Sewers KWT Regional Works Phase 2 - Breidbach to Regional Works Inflows from decommissioned works to new regional works 26000 0 External Potable Bulk 0
108 EC Buffalo City EC125/010 Ancillary Interceptor Sewers KWT Regional Works Phase 3 - Bisho to Breidbach Inflows from decommissioned works to new regional works 44000 0 External Potable Bulk 0
109 EC Buffalo City EC125/011 Regional WWTW Reeston Phase 1 upgrade to 25 ML/day Unlock housing development - Reduce number of Works 175000 0 External Potable Bulk Extend Existing 0
110 EC Buffalo City EC125/011 Regional WWTW Reeston Phase 2 upgrade to 50 ML/day Unlock housing development 0 External Potable Bulk Extend Existing 0
111 EC Buffalo City EC125/011 Regional WWTW Reeston Phase 3 upgrade to 75 ML/day Unlock housing development 0 External Potable Bulk Extend Existing 0
112 EC Buffalo City EC125/012 Deviation of flow from Central to Resston WWTW Single Phase Unlock housing development 70000 0 External Potable Bulk 0
113 EC Buffalo City EC125/013 Pontoon Road Tunnel Single Phase Upgrade/ rehabilitation to tunnel conveying 10 ML/day 245000 0 External Potable Bulk 0
114 EC Buffalo City EC125/014 Eastern Beach Sewers Single Phase Upgrade/ rehabilitation to two sewers conveying 35 ML/day 300000 0 External Potable Bulk 0
115 EC Buffalo City EC125/015 Hood Point Marine Outfall Single Phase Construction of marine outfall to meet permit and unlock housing 200000 0 External Potable Bulk 0
116 EC Buffalo City EC125/016 Second Creek Spill Alleviation Single Phase To prevent pollution of Buffalo River and unlock housing 35000 0 External Potable Bulk 0
117 EC Buffalo City EC125/016 Elimination of rural backlogs Phased Elimination of rural backlogs 243000 0 External Potable Bulk 0
118 EC Buffalo City EC125/016 Upgrade Interceptor Sewer Gonubie Single Phase To prevent pollution of environment and unlock housing 20000 0 External Potable Bulk 0
119 EC Chris Hani DC13/001 Hofmeyer /Middleburg Bulk Water Supply This area is having a serious problem of not having any water around and there was a study conducted by DWAF(Water Supply to Certain Karoo Areas) that will assist in terms of identifying the suitable source to be used. 1000 182000000 182000000 Raw Water Bulk large (R50m-R200m) 910000
120 EC Chris Hani DC13/002 Vetyu / Qota Ward 10 Bulk Water Supply There are many villages that can benefit under this bulk line, this can assist in eliminating the backlog sooner. 15000 11924671 11924671 Internal Bulk medium (R10m-R50m) 214644.078
121 EC Chris Hani Dc13/003 Engcobo Ward 4 Regional Water Supply There are many villages that can benefit under this bulk line, this can assist in eliminating the backlog sooner. 17000 13857142 13857142 Internal Bulk medium (R10m-R50m) 249428.556
122 EC Chris Hani DC13/004 Rathwick Water Supply There are many villages that can benefit under this bulk line, this can assist in eliminating the backlog sooner. 10000 7256465 7256465 Internal Bulk small ( 181411.625
123 EC Chris Hani DC13/005 Whittlesea Waste Water Treatment This is an old Waste Water treatment plant it needs an upgrade to avoid contamination of ground water through spilling of waste. 1000 100000 100000 External Potable Bulk small ( 2500
124 EC Chris Hani DC13/006 Xonxa Water Supply There are many villages that can benefit under this bulk line, this can assist in eliminating the backlog sooner. 16000 12642857 12642857 Internal Bulk medium (R10m-R50m) 227571.426
125 EC Chris Hani DC13/007 Dordrecht Water Supply The DM is eradicating bucket system by constructing VIP Toilets in this town due to unavailability of water and the community can't accept that level of service they even prefer the bucket system. If this bulkline can be constructed it can stop the conflict between the DM and the community. 21774 20000000 21774 18000000 38000000 External Potable Bulk medium (R10m-R50m) 684000
126 EC Chris Hani DC13/008 Cacadu Water Supply There are many villages that can benefit under this bulk line, this can assist in eliminating the backlog sooner. 40626 6000000 6000000 Internal Bulk Refurb Existing small ( 150000
127 EC Chris Hani DC13/009 Banzi North and South Bulk Water Supply. There are many villages that can benefit under this bulk line, this can assist in eliminating the backlog sooner. 5542 11000000 11000000 Internal Bulk medium (R10m-R50m) 198000
128 EC Chris Hani DC13/010 Zola & Phakamisa Water Supply Feasibility report available The current pumping rates are not sufficient and do not fulfill the immediate and future supply needs 2694 934345 934345 External Potable Bulk Refurb Existing small ( Infrastructure Developmen Complete
129 EC Chris Hani DC13/011 Elliot Water Treatment plant This plant need to be upgraded as it is old and also to accommodate future population. 9000 689586 689586 External Potable Bulk Refurb Existing small ( 17239.65
130 EC Chris Hani DC13/012 Elliot Waste Water Treatment plant This is an old Waste Water treatment plant it needs an upgrade to avoid contamination of ground water through spilling of waste. 9000 10000000 10000000 External Potable Bulk small ( 250000
131 EC Chris Hani DC13/013 Cala Water Treatment Works This plant need to be upgraded as it is old and also to accommodate future population. 9500 757758 757758 External Potable Bulk Refurb Existing small ( 18943.95
132 FS Thabo Mofutsanyana Dihlabeng 1 Thabo Mofutsanyana DM: Dihlabeng Regional Scheme Alternative 2 Dihlabeng, Setsoto and Nketoana recently experienced serious water shortages due to the absence of a sustainable water supply system to these areas. Paul Roux and Rosendal in particular are experiencing the most critical water supply problems in the entire Southern Free State. 5419 11066 74000000 74000000 Raw Water Bulk New large (R50m-R200m) Infrastructure Developmen Complete 2
133 FS Thabo Mofutsanyana Maluti-a-Phofung 2 Maluti-a-Phofung LM: The Sterkfontein Dam Qwaqwa Scheme Alternative 5 - All Qwaqwa Towns & Tshiame During the past three years (2003 to 2006) the Maluti-a-Phofung Municipality has experienced critical water shortages during peak demand periods. Development in the region and the associated increase in water consumption has exceeded all expectations, and resulted in interruptions in potable water supply for extended periods. Fika Patso is now unable to supply all needs. 158104 254243 130300000 130300000 Raw Water Bulk New large (R50m-R200m) Infrastructure Developmen Complete 2
134 FS Nketoana 3 Nketona LM: Upgrading of Bulk Water Supply for Petrus Steyn, Lindley and Arlington Alternative 4 The water supply to the four towns of Nketoana i.e. Reitz, Petsana Petrus Steyn and Lindley currently meets the demands but future demands will not be met due to the absence of a sustainable water supply system to this areas. 5135 35494 77494000 77494000 Raw Water Bulk New large (R50m-R200m) Infrastructure Developmen Complete 2 medium 3
135 FS Ngwathe 4 Ngwathe LM: Upgrading of Bulk Water Supply in Edenville Alternative 3 Towns that fall under the jurisdiction of the Ngwathe Local Municipality are experiencing problems with bulk water supply services and in particular the towns of Edenville and Koppies. 9 5528 20461000 20461000 Raw Water Bulk New medium (R10m-R50m) Infrastructure Developmen Complete 1 high 2
136 FS 5 Jagersfontein Fauresmith Water Supply Scheme Alternative 1 - Jagersfontein only Jagersfontein and Fauresmith were entirely dependent on grounwater for their domestic water supply requirements and due to continuous problems associated with the boreholes in 1980 reached an agreement with De Beers to utilize water from a disused mine shaft as a well to supply Jagersfontein. The supply is constantly dropping, is not regarded sustainable and is further now considered as a health hazard. 495 5805 160610000 160610000 Raw Water Bulk New large (R50m-R200m) Infrastructure Developmen Complete 1
137 FS 6 Bulk Water Supply to Rouxville, Smithfield and Zastron All Alternatives The following towns have experienced and are still experiencing problems with provision of water to the their communities due to limitation in bulk water supply: (Rouxville, Uitkoms and Roleleathunya, Smithfield, Rietpoort and Mofulatshepe, Zastron and Matlakeng, An increase in population as well as the level of services provided to residents in these areas has exceeded the capacity of their existing raw-water sources. 689 12547 33680000 33680000 Raw Water Bulk New medium (R10m-R50m) Infrastructure Developmen Complete 3 high 3
138 FS 7 Tokologo Local Municipality: Boshoff, Dealsville, Hertzogville and Environs All Alternatives The water supply to the four towns of Boshof, Dealsville and Hertzogville are currently experiencing water restriction due to a lack surface water. 5009 20434 91000000 91000000 Raw Water Bulk New large (R50m-R200m) Infrastructure Developmen Complete 1 medium 3
139 KZN uThukela Bergville Bulk and Reticulation This Regional Feasibility Report (RFR) aims to establish a strategic approach for the development of a Regional Bulk Water scheme for the extention of the Bergville rural area to serve ,the needs of the people residing in Greenpoint complex, Acton Homes a Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 11800 9200 24362664 24362664 Extend Existing medium (R10m-R50m) Complete
140 KZN uThukela Driefontein Complex Bulk and Reticulation This Regional Feasibility Report (RFR) aims to establish a strategic approach for the development of a Regional Bulk Water scheme infrastructure for the Emnambithi rural area to serve the needs of the people residing in Driefontein Complex area, and viewe Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 65830 31000 126101368 126101368 Extend Existing large (R50m-R200m) Complete
141 KZN uThukela Moyeni / Zwelisha RWSS Phase 4 (Dukuza/ Hoffental) The Regional Feasibility Report (RFR) provided motivation for the extension of the Moyeni and Zelisha Community Water Supply Scheme into a regional scheme using the abstraction and water treatment works at Zwelisha with the capacity to provide potable wat Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 0 0 26103599 26103599 Extend Existing medium (R10m-R50m) Complete
142 KZN Zululand Mandlakazi Phases 2C & 3 This project forms an integral part of the on-going rollout of the Mandlakazi Regional Water Supply Scheme. Phase 2C & 3 of the Mandlakazi RWSS involves the construction of bulk and reticulation infrastructure which will include bulk gravity main, three d Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 14044 2733 22120203 22120203 Extend Existing medium (R10m-R50m) 398163.654
143 KZN Zululand 2006MIGFDC263816 Simdlangentsha Central - Phase 2 The Masterplan for Simdlangentsha central approved by ZDM resolved that bulk raw water for the Central area will be drawn from the Monzona River, purified at the existing Belgrade Water Treatment works and pumped to the main reservoir in Belgrade, from wh Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 39569 39569 30366876 30366876 Raw Water Bulk Extend Existing medium (R10m-R50m) 546603.768
144 KZN Zululand 2006MIGFDC263811 Simdlangentsha West - Phase 1 A masterplan for the Simdlangentsha West regional area was compiled during 2002. Numerous supply options were investigated and the capital cost to supply water and the sustainability of the sources were compared. The option to use bulk water supply from t Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 33984 30821 32399130 32399130 Extend Existing medium (R10m-R50m) 583184.34
145 KZN Zululand Phase 1: 2006MIGFDC263862 Phase 2: 2006MIGFDC263866 Phase 3: 2006MIGFDC263868 Phase 4: ? Usuthu RWSS - Phases 1-4 The project aims supply potable water to approwimately 158,688 people in the Usuthu area. These consumers are spread over an area of about 21,000 km2 between Nongoma and Mahlabathini. The option to use the supply from the Black Mfolozi river near Mjeni wa Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 43898 0 242896193 242896193 Extend Existing macro (>R200m) 728688.579
146 KZN Zululand 2006MIGFDC263847 Coronation RWSS - Phase 1 This project is for provision of bulk municipal infrastructure to various settlements in the Coronation project area. The strategy is to develop stand alone water schemes into the larger regional scheme with a long term water source. Some areas will rem Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 4924 3420 12722627 12722627 Extend Existing medium (R10m-R50m) 229007.286
147 KZN Zululand 2006MIGFDC26102044 Nkonjeni RWSS - Phase 2 The roll out of the Nkonjeni RWSS commenced in 2003. Prior to the commencement of the RWSS, a number of community water supply schemes were implemented using funds provided by DWAF. These schemes will be incorporated into the RWSS. This phase of the proje Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 265817 157131 75296407 75296407 Extend Existing large (R50m-R200m) 376482.035
148 KZN Zululand Simdlangentsha East RWSP - Phase 1 This project aims to provide bulk and internal infrastructure required in the Simdlangentsha Eastern area. The project will serve the population amounting to 53,040 and will cover the following tribal areas: Ndlangamandla, Msibi, Mavuso, Dlamini, Sibiya, Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 53982 18180 25683734 25683734 Internal Bulk Extend Existing medium (R10m-R50m) 462307.212
149 KZN Zululand 2006MIGFDC26263851 Khambi RWSS - Phase 1 This project forms one of two parts of the Mountain View/ Kwandeni/ Dlomodlomo/ Khambi Water supply development strategy. In terms of the development strategy, local water sources will be developed as a first measure to supply 25 lcd. At a later stage and Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 9263 1135 23704261 23704261 Extend Existing medium (R10m-R50m) 426676.698
150 KZN Zululand 2006MIGFDC263857 Hlalindlela/eMondlo RWSS - Phase 1 (Zwelisha/Nhloshana/Nceceni) The Hlalindlela/eMondlo regional water supply scheme will supply water to eMondlo township and surrounding areas (where most of the population is resident) and the Land Reform areas (population scattered). The project will be implemented in three phases, Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 37797 0 26491347 26491347 Extend Existing medium (R10m-R50m) 476844.246
151 KZN Sisonke Franklin Bulk Water Upgrade Franklin is located within the Greater Kokstad Municipality and the project site is bound to the east by road R617 between Swartberg and Koskstad, with a total population of 4,074. The project calls for the upgrading of the bulk water and sewage to allow Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 4074 1634 6848584 6848584 Extend Existing small ( 171214.6
152 KZN Sisonke Underburg Bulks Upgrade Sisonke DM has identified the need to upgrade the water supply scheme of Underberg to ensure it continues to meet the growing demands of the community. To this end, the internal reticulation has been upgraded and Phase 1 is currently being implemented (a Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 8510 8510 14570104 14570104 Internal Bulk Extend Existing medium (R10m-R50m) 262261.872
153 KZN Sisonke Kokstad Bulk Services Upgrading The project application details the proposed upgrading requirements of both the bulk water and wastewater needs for Kokstad. Part of the work has been implemented under Phase 1. However, the town has had to remain on water restrictions as the water works Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 0 0 59514177 59514177 Extend Existing large (R50m-R200m) 297570.885
154 KZN Ugu KwaXolo Water Supply - Bulk The project will source water from the Umtamvuna Abstraction and Treatment Works. The bulk infrastructure and reticulation to the neighbouring phases 1, 2A, 2B and 3 area has previously been implemented. The area under consideration for this funding appli Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 43498 10600 24700000 24700000 Extend Existing medium (R10m-R50m) 444600
155 KZN Ugu 2006MIGFDC21111777 KwaMbotho Bulk Pipeline The proposed project entails the construction of a bulk water supply pipeline from the existing KwaFodo Reservoir to the existing KwaMbotho Reservoir. Cost estimates include for a break pressure tank, isolating, air and scour valves and chambers. No new d Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 23688 0 2256486 2256486 Internal Bulk Extend Existing small ( 56412.15
156 KZN Ugu KwaDeyi Water Supply- Phase 2 The scope of works of this project is to extend the existing KwaDeyi Phase 1 Bulk Water Supply Scheme, which is currently being completed, into the Gumutane area. Some of the bulk infrastructure required for abstraction, treatment and pumping has already Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 38321 0 9955390 9955390 Extend Existing small ( 248884.75
157 KZN Ugu Ezinqoleni Bulk Extensions (Phase 2) The project will source water from the Umtamvuna Abstraction and Treatment Works. The bulk infrastructure and reticulation to the neighbouring phase 1 area has previously been implemented. The area under consideration for this funding application does not Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 54430 0 17000000 17000000 Extend Existing medium (R10m-R50m) 306000
158 KZN Ugu Vulamehlo to Braemar Bulk The project area consists of the Amahlathini and Braemar areas. A phase 1 pipeline had already been constructed and commissioned. It consists of a bulk water supply pipeline from sawoti (which form part of the Vulamehlo KN 104 Scheme )to the existing bulk Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 5263 5263 1537980 1537980 Extend Existing small ( 38449.5
159 KZN Umgungundlovu Greater Eston This project is for the supply of water to the Greater Eston area (± 300 km2 in extent), situated some 40 km south-west of Durban and includes Wards 4, 5, 6, and 7 of Mkhambathini (KN226) and Ward 5 of Richmond (KZ227) Local Municipalities. The proposed d Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 0 0 10209589 10209589 Extend Existing medium (R10m-R50m) 183772.602
160 KZN uMkhanyakude 2004MIGFDC270002 Jozini Bulk WTP This project is for the construction of a new conventional Water treatment facility at an alternative location to the existing works, to service the Jozini Town, Tshongwe / Malobeni project and surrounding areas. The existing site and immediate surrounds Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 38200 15015 12886560 12886560 Extend Existing medium (R10m-R50m) 231958.08
161 KZN uMkhanyakude Upgrade of Mtubatuba Bulk Water Scheme - Phase 1 Upgrade of the Mtubatuba bulk water scheme to ensure it continues to meet the growing consumption demands of the community. The upgrade will be done in phases. Phase 1 - extention of the raw water supplies, including additional boreholes to increase raw s Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 31250 31250 85000000 85000000 Raw Water Bulk Extend Existing large (R50m-R200m) 425000
162 KZN uMkhanyakude Kwangwanase Phase 3 Existing phases 1 and 2 of the Kwangwanase Community Water Supply Scheme were implemented during 1993 and 1997 respectively. Proposed phase 3 of the scheme was identified to upgrade and extend some of the existing infrastructure, together with new infrast Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 33790 9660 76477991 76477991 Extend Existing large (R50m-R200m) 382389.955
163 KZN uMkhanyakude 2005MIGFDC270009 Phelandaba The Phelandaba scheme will consist of four “stand alone” pressure zones (A, B, C and D). Each pressure zone will obtain water from a minimum of three production boreholes (2 duty and 1 standby), from where water will be pumped to a bulk reservoir. A retic Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 36031 0 57158751 57158751 Extend Existing large (R50m-R200m) 285793.755
164 KZN Umzinyathi Keates Drift Abstraction and Purification Plant - Phase 1 The origins of the project are due to the operating problems being experienced at the Ethembeni Community Water supply Project, designed as a 500 m3/day water supply plant. These problems relate primarily to maintaining an adequate supply of raw water for Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 0 0 463980 463980 Raw Water Bulk Extend Existing small ( 11599.5
165 KZN uThungulu 2005MIGFDC280009 MIDDLEDRIFT BULK WATER SERVICES PHASES 1,2 & 3 Bulk water supply to Middledrift Phases 1 (of 3 Phases), being an extension to the existing water supply system, and comprising 38km of bulk pipeline, 144,7km of reticulation pipeline, 3 pump stations with appurtenant electrical connections, 11 new reserv Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 81850 0 40443603 40443603 Extend Existing medium (R10m-R50m) 727984.854
166 KZN uThungulu 2005MIGFDC280021 Greater Mthonjaneni Bulk & Reticulation Phases 1 - 2 Regional supply scheme with Goedertrouw Dam as source to service 82% and 59% of the population in Mthonjaneni and Ntambanana LM. 12 existing stand alone schemes will be incorporated into the regional supply system as well as servicing the needs of 58 603 Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 81990 9224 68695570 68695570 Extend Existing large (R50m-R200m) 343477.85
167 KZN uThungulu 2005MIGFDC280029 MBONAMBI WATER SUPPLY SCHEME PHASES 1-4 Regional supply scheme with Lake Mzingazi as source (Mhlathuze LM as bulk supplier) to serve the Mbonambi and Sokhulu communities of approx 31 500 and 15 600 people. Four phases of implementation with an estimated completion date in January 2017. Bulk infrastructure requirements; augmentation to previous water sources to ensure long term reliability 65983 18847 86532715 86532715 Extend Existing large (R50m-R200m) 432663.575
168 LP MIG Registered Already Nandoni Bulk Water to Sinthumule Kutama (Vhembe DM) As part of the Levhuvhu Govt Water Scheme, DWAF Construction would provide a pipeline at Albasini. The Vhembe Municipality has the responsibility to extend this pipeline from Albasisi for 25km up to Makhado Town and beyond into the Sinthumule/Kutama region (more than 39km of pipework) and the Makhado Air Force Base. The 79 000 population of Sinthumule/Kutama villages have a serious problem as the groundwater supply has diminished and the quality has deteriorated. This bulk pipeline will deposit potable water from the Nandoni Dam into the 3 regional reservoirs from where it will be available to everybody (the existing network system was constructed as part of a presidential lead project under RDP Programme 1). The use is 100% for domestic purposes as potable ware would be supplied in bulk at Albasini. The presidential lead project from the RDP Programme 1 is failing due to bulk water shortage - the problem is critical and there is no further groundwater to obtain. The Makhado Town and Makhado Maximum Prison (3 200 inmates) would also obtain water from this source and relieve the tremendous shortage experienced currently. The Makhado Air Force Base experiences critical water shortages in drier periods when the existing wellfield at the Sand River cannot supply enough water. There are a number of key strategic areas that would benefit from this project. The Dept of Public Works (National) have already a budget of R7.0mil available to help as co-funder. 79000 11800 0 150000000 0 0 0 0 150000000 Raw Water Bulk Extend Existing large (R50m-R200m) Infrastructure Developmen 750000
169 LP Flag Boshielo to Mokopane Transfer Bulk Water Scheme (Mogalakewna LM) As part of the Olifants River Water Resources Development Project (ORWRDP) Phase 2B, DWAF would be constructing a raw water pipeline to a position just east of Mokopane Town for 39 mil m3/annum. Mogalakwena Municipality has evaluated the DWAF distribution proposals and has developed a combined system to distribute raw water to the mines and potable water to the communities. The system will start with a 1000mm diameter pipe and deliver water to 3 large mining groups and three planned water treatment works. The raw water to mines would amount to 50% of the flow and the potable water the other 50%. The potable water is planned to reach about 98% of the Mogalakwnea population residing in towns. The mining development requires raw water to be delivered by 2010. The community water supply would be augmented by this water and is critically needed due to shortage and water quality of the groundwater resource. 215938 97938 0 950500000 0 0 0 0 950500000 Raw Water Bulk Extend Existing macro (>R200m) Infrastructure Developmen Complete
170 LP Crocodile To Lephalale Water Transfer Scheme (Lephalale LM) Eskom has announced that it would construct a coal fired power plant at Lephalale and would require between 3 and 12 mil m3/a of raw water. The Crocodile River system has up to 45 mil m3/a available to transfer, which will be used by Eskom, for coal mining and domestic use. The pipeline would be about 145 km long and transport raw water only to Lephalale area. The Eskom power plant requires raw water to be delivered by 2010. The coal requirement would mean an expansion to the coal mine and their water demand would also be catered by this system. Water for domestic use to Lephalale Town would form part of the demand. 215938 97938 0 1200000000 0 0 0 0 1200000000 Raw Water Bulk Extend Existing macro (>R200m) Infrastructure Developmen 3600000
171 LP Magalies Water Board to Mookgophong Bulk Supply (Mookgophong LM) Mookgophong and BelaBela Municipalities have a serious shortfall of water and the only viable option is to augment potable water from the Magalies Water Board pipeline. This would mean an extension of the pipeline from Modimolle to Mookgophong (pipe length about 45km). The current shortfall amounts to 0.56 mil m3/a at present and the pipeline requirement to augment would be for a capacity of at least 50 l/s. Mookgophong and BelaBela Municipalities have a serious shortfall of water and the only viable option is to augment potable water fis rom the Magalies Water Board pipeline. 215938 97938 0 900500000 0 0 0 0 900500000 External Potable Bulk Extend Existing macro (>R200m) Infrastructure Developmen 2701500
172 LP Mutale Bulk Extensions (Vhembe DM) The Mutale Regional Water Scheme (RWS) provides water to more than 75 000 people mostly in remote rural areas. The extension of the bulk scheme to the whole northern area and the south-eastern side is required. The work required is to extend to the new areas and to upgrade the existing bulk connectors and the treatment works. More than 130km of new pipe is required. The feasibility study of May 2006 proved that the groundwater is not sufficient to supply the total water need. Conjunctive use will be implemented for the whole of the Mutale Scheme 25000 75000 0 165000000 0 0 0 0 165000000 External Potable Bulk Extend Existing large (R50m-R200m) Infrastructure Developmen 825000
173 LP Masisi Wellfield Bulk Supply (Vhembe DM) Masisi Town is situated on the most northern part of the Limpopo Province. This town has about 3 000 residents which all have yard connection. The project is to develop a groundwater wellfield all along the Mutale River which is about 10km south of Masisi Town. Up to 11 boreholes will be equipped and pump to a regional reservoir next to the Mutale River. From there the water would be fed under gravity to Masisi and the rural villages. The 21 villages surrounding Masisi have a serious problem in obtaining water for domestic use. The May 2006 feasibility study proved that the groundwater target areas were not sufficient to supply sufficient water. The Masisi town is the last major centre before entering the Kruger National Park at Pafuri Gate. 3000 15500 0 65000000 0 0 0 0 65000000 External Potable Bulk Extend Existing large (R50m-R200m) Infrastructure Developmen 325000
174 LP Nzhelele Valley Bulk Water Augmentation Feasibility (Vhembe DM) The feasibility to import water into the Nzhelele Valley needs to be evaluated. The only option that seems top be available is to transfer water from the Nandoni Dam into this area. A bulk water transfer pipe can be routed via the Vondo Scheme into this supply area. The existing bulk system would be used as part conveyance for this water to the villages. A serious water shortage exists in the whole Nzhelele Valley. The Mudzhedzi Dam is silting up rapidly and its usefulness is deteriorating. The groundwater in this hot and dry area in limited and the Nzhelele River has a large volume of water allocated to irrigation. 25000 90000 0 750000 750000 Raw Water Bulk Extend Existing large (R50m-R200m) Feasibility Study New 750000
175 LP Nzhelele Valley Bulk Water Augmentation Feasibility (Vhembe DM) The pipeline from Nandoni Dam to Nzhelele area cost 135000000 135000000 Raw Water Bulk Extend Existing large (R50m-R200m) Infrastructure Developmen New
176 LP Bushbuckridge South / Nzikasi North BWS (Bushbuckridge LM & Mbombela DM) Hoxani Water Purification Works. Modules 4 & 5 and bulk distribution in Bushbuckridge & Mbombela (Nzikasi North) Primary water supply in process of implementation 250000 55000 0 145000000 145000000 External Potable Bulk Extend Existing large (R50m-R200m) Infrastructure Developmen Ongoing
177 LP Inyaka RWS (Bushbuckridge LM) Inyaka Water Treatment Works Phase 2 (25 Ml/day) and outstanding bulk distribution system Water Treatment Pipeline systems: 450000 80000 0 40000000 40000000 External Potable Bulk Extend Existing macro (>R200m) Infrastructure Developmen Ongoing
178 LP Inyaka RWS (Bushbuckridge LM) Inyaka Water Treatment Works Phase 2 (25 Ml/day) and outstanding bulk distribution system Acornhoek 180000000 180000000 External Potable Bulk Extend Existing macro (>R200m) Infrastructure Developmen Ongoing
179 LP Inyaka RWS (Bushbuckridge LM) Inyaka Water Treatment Works Phase 2 (25 Ml/day) and outstanding bulk distribution system Thulamahashe-Ludlow 110000000 110000000 External Potable Bulk Extend Existing macro (>R200m) Infrastructure Developmen Ongoing
180 LP Inyaka RWS (Bushbuckridge LM) Inyaka Water Treatment Works Phase 2 (25 Ml/day) and outstanding bulk distribution system Marite 50000000 50000000 External Potable Bulk Extend Existing macro (>R200m) Infrastructure Developmen Ongoing
181 LP Middle Letaba RWS : System M (Mopani DM) • Water treatment works & module 3 Outstanding Infill 280000 40000 0 20000000 20000000 External Potable Bulk Extend Existing large (R50m-R200m) Infrastructure Developmen 100000
182 LP Middle Letaba RWS : System M (Mopani DM) • Parallel mains from Majosi to Shirley & Pump- station extensions 46000000 46000000 External Potable Bulk large (R50m-R200m) Infrastructure Developmen 230000
183 LP Middle Letaba RWS : System M (Mopani DM) • Masakone/Soetfontein/Mamaila bulk mains, pump station & storage 28000000 28000000 External Potable Bulk large (R50m-R200m) Infrastructure Developmen 140000
184 LP Middle Letaba RWS : System M (Mopani DM) • Magoro parallel supply main 21000000 21000000 External Potable Bulk large (R50m-R200m) Infrastructure Developmen 105000
185 LP Middle Letaba RWS : System M (Mopani DM) • Rotterdam/Sedibeng/Ndhengeza bulk supply pipelines & appurtenant 18000000 18000000 External Potable Bulk large (R50m-R200m) Infrastructure Developmen 90000
186 LP Olifantspoort South RWS Phase 5 (outstanding) & Phase 6 (Sekhukhune DM) Ongoing bulk distribution & reticulation project which commenced in 1995 comprising bulk mains from the present Olifantspoort Treatment Works The unserved area has critical water shortages with average supply below 10 l/c/d 30000 6000 0 80000000 80000000 Extend Existing large (R50m-R200m) Ongoing
187 LP School Water Supply (Limpopo Province) 1 452 schools in Limpopo are without a water supply. Every school should have its own borehole or connection to a municipal reticulation. No proper education can take place unless a proper water supply is available. This will also assist in health and hygiene education. 580000 0 0 350000000 0 0 0 350000000 Extend Existing macro (>R200m) 1050000
188 LP Provincial household sanitation (Limpopo Province Upgrading Backlog 4100000 0 0 1600000000 1600000000 MIG Extend Existing macro (>R200m) 1500000
189 LP School Sanitation (Limpopo Province) Upgrading of 642 schools Backlog 260000 0 0 83000000 83000000 MIG Extend Existing large (R50m-R200m) 415000
190 LP Nebo Plateau Bulk Water Supply (Sekhukhune DM) Phase 1: Optimisation of existing Water Resources (2006-2011) Phase 2: Bulk Water Supply Infrastructure development to incorporate water resources from the De Hoop Dam (2011-2015) Phase 3: Bulk Water Supply Infrastructure Development to incorporate Eskom pump-storage scheme water into BWS (2015-2020) The Nebo Plateau is a water scarce area and the existing water resources can only provide the population with a rudimentary volume of 12l/capita/day. The ORWRDP of which the De Hoop Dam is part of, is a National water resource development initiative of which 50% of the volume will be allocated for domestic supply and the balance for mining and industries. The development proposals for domestic water supply to the communities is currently finalised in the BWS Master plan and project specifications. The phased capital investment requirements for bulk services development is as follows: Phase 1(2006-2010) : R220M Phase 2 (2011-2015): R170M Phase 3 (2015-2020): R275M 411000 61400 0 665000000 665000000 External Potable Bulk New macro (>R200m) Infrastructure Developmen Ongoing
191 LP Mooihoek to Burgersfort/Tubatse Bulk Water Supply (Sekhukhune DM) Phase 1: Domestic bulk water interim supply at Steelpoort from Lebalelo Extension, BWS from Mooihoek to Burgersfort, to optimise existing water resources (2006-2010). Phase 2: Extension of water supply from ORWRDP to Steelpoort and Burgersfort, extension of Burgersfort BWS to villages in Tubatse area The Burgersfort Tubatse area is the major Provincial Development Cluster in the Sekhukhune District Municipality due to the development of mining in the area. The existing water resources and the domestic and associated water services infrastructure is not sufficient to cater for the existing and expected growth. The ORWRDP and ORWSDP was initiated to address the increased demand in water resources and the required bulk water infrastructure requirements. The Mooihoek to Burgersfort/Tubatse Feasibility was initiated to optimise and programme development proposal. The phased capital investment requirements for bulk services development is as follows: Phase 1(2006-2010) : R205M Phase 2 (2011-2015): R276M 80000 50000 0 481000000 481000000 External Potable Bulk Extend Existing macro (>R200m) Infrastructure Developmen Ongoing
192 LP Lebalelo Bulk Community Water Supply (Sekhukhune DM) Lebalelo South Phase 2: Balance of BWS Lebalelo Central: BWS Lebalelo North: BWS The phase can be done conjunctively The Lebalelo Community Water Supply System derived from the share DWAF paid on the Lebalelo Raw Water Bulk Supply Pipeline. The mining development in the Dilokong area required the water resource and DWAF used the opportunity to address the lack of infrastructure to communities in the supply area. The feasibility was completed in 2003 and infrastructure development in the first priority area started. The phased capital investment requirements for bulk water services development is as follows: Lebalelo South balance: R45M Lebalelo Central: R194M Lebalelo North: R39M 136000 24000 0 278000000 278000000 External Potable Bulk Extend Existing macro (>R200m) Infrastructure Developmen Ongoing
193 LP Groblersdal/Lukau Bulk Water Supply (Sekhukhune DM) Various phases as per feasibility study. Upgrading of Groblersdal WTW Doubling of rising main to Tafelkop Rising Main to Sterkfontein/Lukau. The Groblersdal/Lukau supply area pertains to the communities north-east of Groblersdal on the south western parts of the Nebo-Plateau. The existing WTW and infrastructure is inadequate to provide the demand in water supply and communities are relying on levels of services well below basic services. The ground water potential in the project area is poor. 46400 11600 0 56000000 56000000 External Potable Bulk Extend Existing large (R50m-R200m) Infrastructure Developmen Ongoing
194 LP Flag Boshielo West East Extension (Sekhukhune DM) The extension of the Flag Boshielo East can be done in various phases as funds are available. The Flag Boshielo RWS was completed with planned extensions towards the east to be addressed in future phases. The Flag Boshielo East supply zone lies between the Flag Boshielo Central Zone and the De Hoop/Nebo Plateau project areas. The Flag Boshielo RWS is designed and planned to serve the villages as the ground water resources are inadequate and of poor quality. 30800 5500 0 41000000 41000000 External Potable Bulk Extend Existing medium (R10m-R50m) Infrastructure Developmen Ongoing
195 LP Mphahlele Regional Water Supply (Capricorn DM) Various phases for the extension of the BWS to communities. The Phasing will be refined and optimised in the Olifants-Sand ORWSDP Feasibility study which commences soon. The Olifant-Sand Transfer Scheme supplies water to Lebowakgomo and Polokwane/Seshego. The communities towards the southern parts of Lepelle-Nkumpi Local Municipality are adjacent to the BWS system and are not benefiting from water supply. Local water resources are scarce and the water quality from the resources is poor. This project will be the final extension to the BWS system. 28800 7200 0 35000000 35000000 External Potable Bulk Extend Existing medium (R10m-R50m) Infrastructure Developmen Complete
196 LP Groothoek Regional Water Supply (Capricorn DM) Various phases for the extension of the BWS to communities. The Phasing will be refined and optimised in the Olifants-Sand ORWSDP Feasibility study which commences soon. The Olifant-Sand Transfer Scheme supplies water to Lebowakgomo and Polokwane/Seshego. Local water resources are scarce and the water quality from the resources is poor to the communities towards the southern parts of Lepelle-Nkumpi Local Municipality . 39500 9900 0 59500000 59500000 External Potable Bulk Extend Existing large (R50m-R200m) Infrastructure Developmen Complete
197 LP Batlokwa (Matoks) Regional Water Supply Feasibility Study (Capricorn DM) The feasibility will address the required capital investments requirements and phases. The Matoks area is situated between Polokwane and Makhado and local water resources is not adequate to supply the demand. Matoks is a Spatial Rationale District growth point and a Population Concentration Area. The Feasibility will investigate and optimise the water resources and distribution systems required to address the current and 2025 water demand of the supply area. Development initiatives are currently delayed due to the poor water supply situation. The water resources to be investigated are local resources optimisation, Nandoni Dam extension and the Mogalakwena/Glen Alpine development. Villages en-route may benefit from the outcomes of the proposed development scenarios. 93000 23200 0 1500000 1500000 Raw Water Bulk Extend Existing macro (>R200m) Feasibility Study New 1500000
198 LP Batlokwa (Matoks) Regional Water Supply Feasibility Study (Capricorn DM) The feasibility will address the required capital investments requirements and phases. Pipeline from Nandoni Dam to Batlokwa area 350000000 350000000 Raw Water Bulk Extend Existing macro (>R200m) Infrastructure Developmen New
199 LP Olifants River Water Resources Development Project (ORWRDP) Construction of the De Hoop Dam is to commence as soon as the environmental approvals are in place. The raw water resources distribution comprises of a number of phases that would be built. The conveyance system is for 100% raw water distribution. water will be taken from this development and treated for domestic use by the WSAs. The phases are: The mining development requires raw water to start being delivered by 2010. The domestic water from this conveyance system relies heavily on this bulk pipeline to be constructed. Downstream planning is in place for this distribution into the various municipal areas. 950000 760000 0 0 Raw Water Bulk New macro (>R200m) Ongoing
200 LP Olifants River Water Resources Development Project (ORWRDP) Ph 2A: De Hoop Dam and Road P169-1 relocation 1281000000 1281000000 Raw Water Bulk New macro (>R200m) Ongoing
201 LP Olifants River Water Resources Development Project (ORWRDP) Ph2B: Flag Boshielo to Mokopane Pipeline Phase 1 854000000 854000000 Raw Water Bulk New macro (>R200m) Ongoing
202 LP Olifants River Water Resources Development Project (ORWRDP) Ph2Ca: Steelpoort Weir, Abstraction Works, Balancing Dams & Pumping Stations 561000000 561000000 Raw Water Bulk New macro (>R200m) Ongoing
203 LP Olifants River Water Resources Development Project (ORWRDP) Ph 2Da: Pipeline from Steelpoort Balancing Dam to Mooihoek 359000000 359000000 Raw Water Bulk New macro (>R200m) Ongoing
204 LP Olifants River Water Resources Development Project (ORWRDP) Ph2E: Pipeline parallel to Lebalelo Scheme 126000000 126000000 External Potable Bulk New macro (>R200m) Ongoing
205 LP Olifants River Water Resources Development Project (ORWRDP) Ph2F:Pipeline from Lebalelo Scheme to Olifantspoort 608000000 608000000 External Potable Bulk New macro (>R200m) Ongoing
206 LP Olifants River Water Resources Development Project (ORWRDP) Ph2G: Flag Boshielo to Mokopane Pipeline Phase 2 521000000 521000000 Raw Water Bulk New macro (>R200m) Ongoing
207 MP Thaba Chweu Lydenburg: Refurbishment of water treatment plant & bulk mains Phased over 3 years WTP can not cope with the growth in demand 31920000 31920000 Refurb Existing medium (R10m-R50m) 574560
208 MP Thaba Chweu Lydenburg: Construction of new reservoir Phased over 3 years Inadequate storage capacity 27500000 27500000 Refurb Existing medium (R10m-R50m) 495000
209 MP Thaba Chweu Lydenburg: Refurbishment of dam flood gates Repair to existing flood gates to increase the storage capacity of the dam 930000 930000 Refurb Existing small ( 23250
210 MP Thaba Chweu Lydenburg: Feaibility study for new dam Capacity of existing dam inadequate to meet the exising and future damands 800000 800000 Refurb Existing small ( 20000
211 MP Thaba Chweu Boomplaats Bulk Water supply 2500000 2500000 Raw Water Bulk small ( 62500
212 MP Thaba Chweu Simile Water feeder Line refurbish 300000 300000 Refurb Existing small ( 7500
213 MP Thaba Chweu MIG/MP0321/W/06/07 Stasie - Construction of connector sewer. Connection to Existing sewer plant 1200000 1200000 small ( 30000
214 MP Nkomazi Mbuzini bulk supply Upgrading of Bulk supply 3000000 3000000 Refurb Existing small ( 75000
215 MP Nkomazi Tonga east Water Treatment works Can be phased over 2 years New WTW for area supplied with chlorinated water 80000 24000000 24000000 medium (R10m-R50m) 432000
216 MP Nkomazi Upgrade of Raw Water Supply to Tonga WTW Increase capacity to meet demand 3000000 3000000 Refurb Existing small ( 75000
217 MP Nkomazi Upgrading of Nyathi Water Treatment Works Can be phased over 2 years Increase capacity to meet demand 15000000 15000000 Refurb Existing medium (R10m-R50m) 270000
218 MP Nkomazi 1 Ermelo Sewer Treatment works Lacking capacity urgently need 8000000 8000000 small ( 200000
219 MP Nkomazi to be upgraded 0 #N/A
220 MP Nkomazi 0 #N/A
221 MP Nkomazi 2 RaisingHighering of Torbanite dam wall Dam lacking capacity during dry 5000000 5000000 Refurb Existing small ( 125000
222 MP Nkomazi season and wall need to be highered 0 #N/A
223 MP Nkomazi 3 Petdam dam safety Inspection Safety inspection need to be conducted 150000 150000 Refurb Existing small ( 3750
224 MP Nkomazi 0 #N/A
225 MP Nkomazi 4 Breyton Water Treatment Works Lacking capacity need to be upgraded 4000000 4000000 Refurb Existing small ( 100000
226 MP Nkomazi 0 #N/A
227 MP Nkomazi 5 Sheepmoor Bulk Water Pipeline and Treatment Plant Supply of raw water and treatment thereof for potable usage 7000000 7000000 small ( 175000
228 MP Nkomazi Completion of the construction of Siyazenzela Sewer Treatment Plant 2400000 2400000 small ( 60000
229 MP Nkomazi Construction of Sewer Reticulation Perdekop / Siyazenzela 3000000 3000000 small ( 75000
230 MP Nkomazi Upgrading Sewer Treatment Plant Wakkerstroom / Esizamaleni 5000000 5000000 small ( 125000
231 MP Nkomazi Sewer Reticulation Wakkerstroom / Esizamaleni 4500000 4500000 small ( 112500
232 MP Nkomazi Installation of pre paid water meters, yard connections in Daggakraal 7500000 7500000 small ( 187500
233 MP Nkomazi Rural Water Supply 3000000 3000000 small ( 75000
234 MP Nkomazi Upgrading and rehabilitation of Amersfoort Water Reticulation 2000000 2000000 small ( 50000
235 NC Kgalagadi Gamagara MIGnew Bulk water supply Kathu The project comprises of different phases which incl main water supply to Temco, water rising main to Kathu East as well as the construction of a reservoir and pressure tower. Installation of bulk water supply pipeline as well as water rising main to Ext 3 will also be included Bulk services need to be upgraded. LM approached the DBSA for a loan to implement the project 8000 48000000 48000000 medium (R10m-R50m) 864000
236 NC Kgalagadi Gamagara MIGnew Bulk sewerage supply Kathu The project comprises of different phases which includes the main outfall sewerage pipeline at Kathu east, the sewer pump station as well as the sewerage rising main Bulk services need to be upgraded. LM approached the DBSA for a loan to implement the project 8000 52000000 52000000 large (R50m-R200m) 260000
237 NC Kgalagadi Gamagara MIG048 Kathu: Provision of a Water Reticulation Network Waterborne sanitation as well as the water reticulation network to 89 stands in Kathu People currently living in the area does not have services according to RDP standard 356 3182998 3182998 small ( 79574.95
238 NC Kgalagadi Ga-Segonyana MIG223 Batlharos water network (phase 5) Provision of water infrastructure to settlement People currently living in the area does not have services according to RDP standard 12440 500000 500000 small ( 12500
239 NC Kgalagadi Ga-Segonyana MIG216 Ga mopedi water network Provision of water infrastructure to settlement People currently living in the area does not have services according to RDP standard 2064 2500000 2500000 small ( 62500
240 NC Kgalagadi Ga-Segonyana MIG218 Galotolo water network Provision of water infrastructure to settlement People currently living in the area does not have services according to RDP standard 546 350000 350000 small ( 8750
241 NC Kgalagadi Ga-Segonyana MIG214 Garuele water network Provision of water infrastructure to settlement People currently living in the area does not have services according to RDP standard 546 350000 350000 small ( 8750
242 NC Kgalagadi Ga-Segonyana MIG190 Gasebolao water reticulation Provision of water infrastructure to settlement People currently living in the area does not have services according to RDP standard 294 1117714.65 1117714.65 small ( 27942.8663
243 NC Kgalagadi Ga-Segonyana MIG210 Geelboom water network Provision of water infrastructure to settlement People currently living in the area does not have services according to RDP standard 168 350000 350000 small ( 8750
244 NC Kgalagadi Ga-Segonyana MIG277 Regional wastewater treatment works To upgrade the Kuruman WWTW to a regional works that serves Kuruman and surrounding villages Having one registered WWTW rather than number of smaller works, all sewage can be treated to standard 56758 7387285 7387285 External Potable Bulk Extend Existing small ( 184682.125
245 NC Kgalagadi Ga-Segonyana MIG208 Lokaleng water network Provision of water infrastructure to settlement People currently living in the area does not have services according to RDP standard 500 350000 350000 small ( 8750
246 NC Kgalagadi Ga-Segonyana MIG205 Magojaneng water network Provision of water infrastructure to settlement People currently living in the area does not have services according to RDP standard 10000 2500000 2500000 small ( 62500
247 NC Kgalagadi Ga-Segonyana MIG189 Maruping water reticulation Provision of water infrastructure to settlement People currently living in the area does not have services according to RDP standard 10440 9013803.6 9013803.6 small ( 225345.09
248 NC Kgalagadi Ga-Segonyana MIG184 Maruping sewer reticulation Provision of sewerage infrastructure to settlement People currently living in the area does not have services according to RDP standard 10440 8226109.5 8226109.5 small ( 205652.7375
249 NC Kgalagadi Ga-Segonyana MIG201 Pietbos water network Provision of water infrastructure to settlement People currently living in the area does not have services according to RDP standard 342 350000 350000 small ( 8750
250 NC Kgalagadi Ga-Segonyana MIG199 Sedibeng water network Provision of water infrastructure to settlement People currently living in the area does not have services according to RDP standard 1926 1200000 1200000 small ( 30000
251 NC Kgalagadi Ga-Segonyana MIG197 Seoding water network Provision of water infrastructure to settlement People currently living in the area does not have services according to RDP standard 5980 3500000 3500000 small ( 87500
252 NC Kgalagadi Ga-Segonyana MIG192 Seoding sewer network for 600 stands Provision of sewerage infrastructure to settlement People currently living in the area does not have services according to RDP standard 5980 2700000 2700000 small ( 67500
253 NC Kgalagadi Ga-Segonyana MIG191 Vergenoeg water reticulation Provision of water infrastructure to settlement People currently living in the area does not have services according to RDP standard 991 2431414.2 2431414.2 small ( 60785.355
254 NC Kgalagadi Ga-Segonyana MIG177 Vergenoeg sewer reticulation Provision of sewerage infrastructure to settlement People currently living in the area does not have services according to RDP standard 991 2782084.5 2782084.5 small ( 69552.1125
255 NC Kgalagadi Moshaweng MIG040 Lebonkeng: water reticulation The project comprises the construction of water supply infrastructure viz. water reticulation network and related water services The water supply infrastructure is currently below RDP standard and the water sources is unreliable 450 2855382 2855382 small ( 71384.55
256 NC Kgalagadi Moshaweng MIG Water reticulation to Damrose 1 & 3 The project comprises the construction of water supply infrastructure viz. water reticulation network and related water services The water supply infrastructure is currently below RDP standard and the water sources is unreliable 300 5568430 5568430 small ( 139210.75
257 NC Kgalagadi Moshaweng MIG Water reticulation to Kookfontein The project comprises the construction of water supply infrastructure viz. water reticulation network and related water services The water supply infrastructure is currently below RDP standard and the water sources is unreliable 330 2867048 2867048 small ( 71676.2
258 NC Kgalagadi Moshaweng MIG Water reticulation to Lothakane The project comprises the construction of water supply infrastructure viz. water reticulation network and related water services The water supply infrastructure is currently below RDP standard and the water sources is unreliable 1006 4084572 4084572 small ( 102114.3
259 NC Namakwa Karoo Hoogland MIG171 Sutherland: Wastewater Treatment works - oxidation dams (Pl Kwezi V3) Upgrade WWTW and construction of new inlet structure To prevent continuous overflowing of WWTW. Upgrading will ensure handling of both biological load and hydraulic load 4214 2630254 2630254 Internal Bulk Extend Existing small ( 65756.35
260 NC Namakwa Karoo Hoogland MIG170 Williston: Oxidation Ponds (Pl KweziV3) Upgrade WWTW and construction of new overflow structure To prevent continuous overflowing of WWTW. Upgrading will ensure handling of both biological load and hydraulic load 3648 2607972 2607972 Internal Bulk Extend Existing small ( 65199.3
261 NC Namakwa Karoo Hoogland MIG169 Fraserburg water reticulation Upgrade existing water reticulation network Water network in poor condition, upgrade ensure continuous good living conditions 2262 6357700 6357700 Refurb Existing small ( 158942.5
262 NC Namakwa Hantam MIG167 Loeriesfontein: oxidation ponds Upgrade existing oxidation ponds Capacity not large enough-current flow sewerage are overflowing on municipal land 4000 2425350 2425350 Internal Bulk Extend Existing small ( 60633.75
263 NC Namakwa Hantam MIG168 Nieuwoudtville: oxidation ponds Upgrade existing oxidation ponds Capacity not large enough-current flow sewerage are overflowing on municipal land 3500 3020000 3020000 Internal Bulk Extend Existing small ( 75500
264 NC Namakwa Kamiesberg MIG323 Kamassies:rehabilitation of water network Water distribution system Water system old water losses occur 330 1295938 1295938 Refurb Existing small ( 32398.45
265 NC Namakwa Kamiesberg MIG668 Spoegrivier: Water Network Water distribution system Installation of a water network 222 1932158 1932158 small ( 48303.95
266 NC Namakwa Khai-Ma MIG241 Pofadder/Onseepkans: Sewerage works & network Construction of sewerage works as part of BE Provide adequate sewer reticulation to residents of 114 new stands 114 873331 873331 small ( 21833.275
267 NC Namakwa Khai-Ma MIG097 Upgrading of internal network, pipeline from Pella to Pofadder Installation of pipeline of 25km from Pella WB to Pofadder Existing pipeline does not supply sufficient water to growing population 1317 6840000 6840000 Refurb Existing small ( 171000
268 NC Namakwa Khai-Ma MIG335 Witbank bulk water supply 2024 4334559 4334559 Refurb Existing small ( 108363.975
269 NC Namakwa Nama Khoi MIG099 Okiep: Oxidation Ponds Phase 2 Re design, re-build of existing ponds Sewerage overflowing capacity of oxidation ponds not sufficient 8000 2127500 2127500 Internal Bulk Extend Existing small ( 53187.5
270 NC Namakwa Richtersveld MIG326 Lekkersing, Eksteenfontein, Port Nolloth: bulk water Improvement ,installation of pipeline Currently ground water not sustainable source, bad quality 11525 50000000 50000000 medium (R10m-R50m) 900000
271 NC Siyanda //Khara Hais MIG330 Upington: Abraham September water treatment works Extend WWTW, provision algae removal Problems meeting water demand, decline in treated water quality 72486 22782900 22782900 medium (R10m-R50m) 410092.2
272 NC Siyanda //Khara Hais MIG329 Upington:main sewer pipeline Provision main connection line for new erven 4680000 4680000 MIG New small ( 117000
273 NC Siyanda Kai !Garib MIG154 Kakamas:sewer network Incorporating old conservancy tanks within exciting sewer network Old conservancy tanks poses health threat 7304 670669 670669 small ( 16766.725
274 NC Siyanda Kgatelopele MIG345 Sewer system: phase 4 Installation of sewer network toilet structures were build, sewer network now needed 100 7095360 7095360 small ( 177384
275 NC Frances Baard Dikgatlong MIG258 Barkly West: Bulk water supply Construction of Elevated Water Tower, related bulk water supply lines Elevate low velocity and pressure problems in Barkley west 4562 10250000 10250000 medium (R10m-R50m) 184500
276 NC Frances Baard Dikgatlong MIG260 WWTW Barkly wes The construction of the sewerage works, inlet works, pipe works between dam, oxidation ponds and a waterborne sewerage network for 552 erven Bulk services need to be upgraded due to new developments in the area as well as the bucket eradication programme 26370 12000000 12000000 medium (R10m-R50m) 216000
277 NC Frances Baard Magareng Relocation of sewer plant The relocation of the sewerage plant in Warrenton Project has started but must be implemented over numerous financial years. Should additional funding be obtained, the project cost will decrease and services would be sooner in place to prevent contamination and possible health issues 0 Internal Bulk Extend Existing
278 NC Frances Baard Phokwane MIG334 Jan Kempdorp bulk water distribution Construction of elevated tank Provide sufficient water storage current and new population 4249 6981502.5 6981502.5 Refurb Existing small ( 174537.5625
279 NC Frances Baard Phokwane MIG365 Upgrading of waster water treatment works Upgrading of waste water treatment works WWTW currently operating above design capacity 19771 8585739 8585739 Internal Bulk Extend Existing small ( 214643.475
280 NC Frances Baard Sol Plaatje MIG246 Galeshewe/Goga: rehabilitation of sewage pump station Rehabilitation of Goga pump station Equipment more that 20 years old reached end of life cycle 0 57227 6056820 6056820 small ( 151420.5
281 NC Frances Baard Sol Plaatje MIG243 Homevale: waste water treatment works Upgrade WWTW to capacity of 45MI/day WWTW currently operating above design capacity 0 232431 43173396 43173396 Internal Bulk Extend Existing medium (R10m-R50m) 777121.128
282 NC Frances Baard Sol Plaatje MIGnew Lerato park bulk service water 1777 1700000 1700000 small ( 42500
283 NC Frances Baard Sol Plaatje MIGnew Lerato park bulk service sanitation 1777 3500000 3500000 small ( 87500
284 NC Frances Baard Sol Plaatje MIG150 Promised land: Water reticulation Provision potable water to community Planned exspansion of erven 4200 4200000 4200000 small ( 105000
285 NC Frances Baard Sol Plaatje MIG245 Ritchie bulk water supply Upgrading of bulk water supply infrastructure incl raw water extraction capacity, purification capacity, storage capacity and transfer pumping capacity to meet the projected demand for the next ten years. To meet the projected demand for the next ten years 12516 6301879 6301879 Raw Water Bulk Refurb Existing small ( 157546.975
286 NC Frances Baard Sol Plaatje MIG244 Ritchie: waste water treatment works Upgrade WWTW from oxidation pond to activated sludge system WWTW currently operating above design capacity 12519 8821685 8821685 Internal Bulk Extend Existing small ( 220542.125
287 NC Frances Baard Sol Plaatje MIG079 Riverton: Rehabilitate Recirculation Dam 39680 1999560 1999560 Refurb Existing small ( 49989
288 NC Pixley ka Seme Emthanjeni MIG315 Bulk water supply phase2 Equipping boreholes,providing infrastructure for conveying waterto reservoir complex Current water supply not enough to supply current demands 6928 14062223 14062223 Refurb Existing medium (R10m-R50m) 253120.014
289 NC Pixley ka Seme Emthanjeni MIG090 De Aar: Wastewater Collection System 2731 7532138 7532138 small ( 188303.45
290 NC Pixley ka Seme Emthanjeni MIG312 Extension 22 water network 1700 2664145.8 2664145.8 small ( 66603.645
291 NC Pixley ka Seme Emthanjeni MIG313 Extension 22 sewer network 1700 4666875 4666875 small ( 116671.875
292 NC Pixley ka Seme Siyancuma MIG281 Douglas Asbestos Sewer rising main Replacement of old asbestos sewer rising mains between the Breipaal and main pump stations of the sewerage treatment works The main lines are rapidly deteriorating with pipewalls falling into the inner diameter narrowing and blocking pipelines 15478 7522354 7522354 small ( 188058.85
293 NC Pixley ka Seme Siyathemba MIG446 Sewage works Upgrading of the exsisting WWTW in Prieska 10416 8892000 8892000 Internal Bulk Extend Existing small ( 222300
294 NC Pixley ka Seme Thembelihle MIG675 Hopetown: Bulk Water Supply 2002 30620000 30620000 medium (R10m-R50m) 551160
295 NC Pixley ka Seme Ubuntu MIG351 Sewer pump station Sewer pump station for 300 erven and electricity supply to pump station 8413 858203.4 858203.4 small ( 21455.085
296 NC Pixley ka Seme Ubuntu MIG350 Civil services for 314 erven Construction of water network, metered water site connections, sewer network with site constructions, graded roads and on-surface storm water infrastructure No serviced erven exist for residents to construct their top structures 8413 1703088 2554631 4257719 small ( 106442.975
297 NC Pixley ka Seme Umsobomvu MIG161 Operation vula: water reticulation Installation of a water reticulation network for 188 residention stands with metered house connections New development where sewerage network was already installed. 978 386855 386855 small ( 9671.375
298 NC Pixley ka Seme Umsobomvu MIG157 Supply line between purification works and new reservoir Construction of a pipeline of different classes from the purification works to the excisting supply line from the new reservoir 34884 2400799 2400799 Refurb Existing small ( 60019.975
299 NC Pixley ka Seme Umsobomvu MIG141 Bulk water supply from Orange river Upgrading of water supply from the Orange River to Kuyasa Currently the water supply is not enough to supply in the hot summer months when Colesberg is also catering 24884 15708493 15708493 Refurb Existing medium (R10m-R50m) 282752.874
300 NC Pixley ka Seme Umsobomvu MIG142 Wastewater treatment works Upgrading of existing oxidation ponds to an activated sludge system to upgrade the currently overloaded WWTW 23036 13100520 7249262 20349782 Refurb Existing medium (R10m-R50m) 366296.076
301 NC Pixley ka Seme Umsobomvu MIG144 Masizakhe bulk water supply Upgrading of the bulk water supply to accommodate the additional water demand in Masizakhe The water purification works lack in sufficient capacity to supply Masizakhe of enough water 1453 465632 465632 Refurb Existing small ( 11640.8
302 NC Pixley ka Seme Umsobomvu MIG143 Masizakhe oxidation ponds Upgrading of the oxidation ponds to accommodate the additional sewage outflow from Masizakhe small bore sewerage system The capacity of the existing sewage oxidation dams are totally inadequate to provide for the current sewage treatment demand of Masizakhe 1453 479236 479236 Internal Bulk Extend Existing small ( 11980.9
303 NC Pixley ka Seme Umsobomvu MIG147 Bulk water supply The siting of new production boreholes and the construction of a water supply line from the new borehole 10000 4943539.32 4943539.32 Internal Bulk New small ( 123588.483
304 NC Pixley ka Seme Umsobomvu MIG146 Replacement of sewer pumps The upgrade of the existing sewer pump stations in Noupoort 10000 1295781 1295781 Internal Bulk Extend Existing small ( 32394.525
305 NW 1 Mafikeng Peri-urban water supply cheme Phases 3, 4 and 5 (Internal reticulation only) Phases 1 and 2, incuding bulk supply to phases 3 & 4 already complete. Existing water supply is from local boreholes, with a high groundwater table. Extensive use of pit latrines will lad o severe risk of pollution. 63835 0 0 43868000 63835 37371000 81239000 Internal Bulk Extend Existing large (R50m-R200m) 406195
306 NW 2 Central Regional Bulk Water Supply Scheme Feasibility Study only Severe water shortages faced by communities served by existing groundwater resources, to be relieved by existing tretment capacity at Midvaal WPW 184258 10000 980919 980919 small ( Feasibility Study New 980919
307 NW 3 Ratlou Local Municipality BWS Feasibility Study only Dam and purification works to be constructed to alleviate severe water shortages faced by communities served by existing groundwater resources. 52665 0 52665 1662674 1662674 Extend Existing small ( Feasibility Study New 1662674
308 NW 4 Utilisation of Taung Dam Water Feasibility Study only Taung Dam water is presently not used. Existing municipal consumers use very expensive water from the Vaal Harts canal system, and should use Taung Dam water instead. 96000 5000 101000 1060000 1060000 Extend Existing small ( Feasibility Study New 1060000
309 WC Beaufort West 0261/BS/0607 Beaufort West: Investigation for New Aquifers Bulk Sanitation, External Not available 31161 200000 200000 External Potable Bulk small ( 5000
310 WC Bergrivier 0252/BS/0607 Piketberg: New Waste Water Treatment Plant Bulk Sanitation, Internal Not available 9273 850000 850000 Internal Bulk small ( 21250
311 WC Bergrivier 0253/BS/0607 Piketberg: New External Sewer Bulk Sanitation, External Not available 9273 680017 680017 External Potable Bulk small ( 17000.425
312 WC Bergrivier 0254/BS/0607 Piketberg: New External Water Supply Bulk Water, 100% domestic, External Not available 9273 2380000 2380000 External Potable Bulk Refurb Existing small ( 59500
313 WC Bergrivier 0255/BS/0607 Velddrif: New External Water Supply Bulk Water, 100% domestic, External Not available 7321 1503045 1503045 External Potable Bulk Refurb Existing small ( 37576.125
314 WC Breede Valley 113516 Touws River: Rehabilitate Bok River Water Supply Bulk Water, 100% domestic, External Not available 6864 1245614 1245614 External Potable Bulk Refurb Existing small ( 31140.35
315 WC Breede Valley 113522 De Doorns: New Reservoir Bulk Water, 100% domestic, Internal Not available 12564 1500000 1500000 Internal Bulk Refurb Existing small ( 37500
316 WC Cape Town 2457 Potsdam: Upgrade Waste Water Treatment Plant Bulk Sanitation, External Not available 81364 85194000 85194000 External Potable Bulk large (R50m-R200m) 425970
317 WC Cape Town 3783 N2 Gateway: Delft Symphony: New Main Sewer Outfall Bulk Sanitation, External Not available 5000 4117500 4117500 External Potable Bulk small ( 102937.5
318 WC Cape Town 4366 N2 Gateway: Joe Slovo: Bulk Sewer Bulk Sanitation, External Not available 5000 1314600 1314600 External Potable Bulk small ( 32865
319 WC Cape Town 4387 N2 Gateway: Delft Towns 7-9, Precinct 2&3: New Bulk Sewer Bulk Sanitation, External Not available 5000 1114200 1114200 External Potable Bulk small ( 27855
320 WC Cape Town 0088/BS/0506 Lwandle: New Steenbras Pipeline Bulk Sanitation, External Not available 5000 1268190 1268190 External Potable Bulk small ( 31704.75
321 WC Cape Town 4386 N2 Gateway: Delft Towns 7-9, Precinct 2&3: New Bulk Water Bulk Water, 100% domestic, External Not available 5000 512400 512400 External Potable Bulk Refurb Existing small ( 12810
322 WC George 112288 George: Augmentation of Raw Water Supply Raw Water Bulk, 100% domestic, External Not available 41354 83048802 83048802 Raw Water Bulk Refurb Existing large (R50m-R200m) 415244.01
323 WC Hessequa 113760 Bitouville, Gouritsmond: New Outfall Sewer Line Bulk Sanitation, Internal Not available 1076 771000 771000 Internal Bulk small ( 19275
324 WC Hessequa 113779 Albertinia: New Outfall Sewer Line Bulk Sanitation, Internal Not available 3190 706000 706000 Internal Bulk small ( 17650
325 WC Kannaland 4341 Zoar: Bucket Eradication: New Sanitation Bulk Sanitation, Internal Not available 3219 13147000 13147000 Internal Bulk medium (R10m-R50m) 236646
326 WC Knysna 3342 Sedgefield: Additional Waste Water Treatment Capacity Bulk Sanitation, Internal Not available 4135 10390000 10390000 Internal Bulk medium (R10m-R50m) 187020
327 WC Knysna 3112 Rheenendal: Water Augmentation Bulk Water, 100% domestic, External Not available 1899 4560000 4560000 External Potable Bulk Refurb Existing small ( 114000
328 WC Knysna 3343 Windheuwel: Bulk Services Bulk Water, 100% domestic, Internal Not available 39309 26514000 26514000 Internal Bulk Refurb Existing medium (R10m-R50m) 477252
329 WC Knysna 3344 Knysna: Long Term Augmentation Plan Bulk Water, 100% domestic, External Not available 39309 570000 570000 External Potable Bulk Refurb Existing small ( 14250
330 WC Knysna 3406 Karatara: Raw Water Pipeline Ph2 Raw Water Bulk, 100% domestic, External Not available 537 2006000 2006000 Raw Water Bulk Refurb Existing small ( 50150
331 WC Knysna 0259/BS/0607 Knysna: Bongani, Concordia, Dam-se-Bos: New Bulk Sewer Scheme Bulk Water, 100% domestic, External Not available 6796 726818 726818 External Potable Bulk Refurb Existing small ( 18170.45
332 WC Matzikama 0246/BS/0607 Klawer: New Pump Station & Rising Main Bulk Sanitation, Internal Not available 8371 1589759 1589759 Internal Bulk small ( 39743.975
333 WC Matzikama 0241/BW/0607 Vredendal North: New External Water Supply Bulk Water, 100% domestic, External Not available 16153 871500 871500 External Potable Bulk Refurb Existing small ( 21787.5
334 WC Matzikama 0242/BS/0607 Vredendal North: Upgrade Waste Water Treatment Works Bulk Sanitation, Internal Not available 16153 5023665 5023665 Internal Bulk small ( 125591.625
335 WC Matzikama 0244/BW/0607 Vanrhynsdorp: New External Water Supply Bulk Water, 100% domestic, External Not available 5967 1416834 1416834 External Potable Bulk Refurb Existing small ( 35420.85
336 WC Matzikama 0245/BW/0607 Klawer: New External Water Supply Bulk Water, 100% domestic, External Not available 8371 2433826 2433826 External Potable Bulk Refurb Existing small ( 60845.65
337 WC Mossel Bay 0094/BS/0506 Mossel Bay: Rehabilitate Sewer Systems: Flood Damage Bulk Sanitation, Internal Not available 46861 310000 310000 Internal Bulk small ( 7750
338 WC Mossel Bay 3787 Klein Brak River: Upgrade Water Purification Plant Bulk Water, 100% domestic, Internal Not available 921 5516460 5516460 Internal Bulk Refurb Existing small ( 137911.5
339 WC Overstrand 2745 Kleinmond: Water: New Booster Pump Bulk Water, 100% domestic, Internal Not available 5358 1036659 1036659 Internal Bulk Refurb Existing small ( 25916.475
340 WC Prince Albert 3937 Prince Albert: Upgrade Bulk Water Pipeline Ph2 Bulk Water, 100% domestic, Internal Not available 6060 1097000 1097000 Internal Bulk Refurb Existing small ( 27425
341 WC Saldanha Bay 4804 Saldanha Bay: Hannas Bay: New 2Ml Reservoir Bulk Water, 100% domestic, Internal Not available 2355 2000000 2000000 Internal Bulk Refurb Existing small ( 50000
342 WC Stellenbosch 111867 Kayamandi: Watergang Housing: Upgrade Main Sewer Outfall Bulk Sanitation, Internal Not available 15130 1577376 1577376 Internal Bulk small ( 39434.4
343 WC Swartland 113837 Darling: Upgrade Waste Water Treatment Plant Bulk Sanitation, Internal Not available 6681 1616000 1616000 Internal Bulk small ( 40400
344 WC Swellendam 3669 Suurbraak: New Waste Water Treatment Plant Bulk Sanitation, Internal Not available 5220 4265000 4265000 Internal Bulk small ( 106625
345 WC Swellendam 3674 Railton: Upgrade Main Outfall Sewer Bulk Sanitation, Internal Not available 10114 972000 972000 Internal Bulk small ( 24300
346 WC Swellendam 3684 Suurbraak: New Reservoir Bulk Water, 100% domestic, Internal Not available 5220 1050000 1050000 Internal Bulk Refurb Existing small ( 26250
347 WC Swellendam 4129 Swellendam: Buffeljags River: Rehabilitate Water Supply Pipelines Bulk Water, 100% domestic, Internal Not available 2432 3750600 3750600 Internal Bulk Refurb Existing small ( 93765
348 WC Theewaterskloof 3788 Botrivier: Sanitation: Waste Water Treatment Works Bulk Sanitation, Internal Not available 6618 4200000 4200000 Internal Bulk small ( 105000
349 WC Theewaterskloof 3810 Grabouw: Upgrade Sewer Rising Main Bulk Sanitation, Internal Not available 21590 1600000 1600000 Internal Bulk small ( 40000
350 WC Theewaterskloof 3814 Botrivier: Upgrade Sewer Network Bulk Sanitation, Internal Not available 6618 600000 600000 Internal Bulk small ( 15000
351 WC Theewaterskloof MT04 Grabouw: Sanitation: Bulk Sewer Bulk Sanitation, Internal Not available 21590 1600000 1600000 Internal Bulk small ( 40000
352 WC Theewaterskloof MT06 Villiersdorp: Sanitation: Sewer Line Bulk Sanitation, Internal Not available 6954 150000 150000 Internal Bulk small ( 3750
353 WC Theewaterskloof 3875 Grabouw: New 4Ml Reservoir Bulk Water, 100% domestic, Internal Not available 21590 4880000 4880000 Internal Bulk Refurb Existing small ( 122000
354 WC Theewaterskloof 4186 Grabouw: Water: Pump Line Bulk Water, 100% domestic, Internal Not available 21590 1200000 1200000 Internal Bulk Refurb Existing small ( 30000
355 WC Theewaterskloof 4197 Grabouw: Upgrade Raw Water Supply Raw Water Bulk, 100% domestic, External Not available 21590 1600000 1600000 Raw Water Bulk Refurb Existing small ( 40000
356 WC Theewaterskloof 4214 Botrivier: Water Treatment Works Bulk Water, 100% domestic, Internal Not available 6618 6000000 6000000 Internal Bulk Refurb Existing small ( 150000
357 WC Theewaterskloof MT01 Genadendal: Water: Reservoir Bulk Water, 100% domestic, Internal Not available 3293 900000 900000 Internal Bulk Refurb Existing small ( 22500
358 WC Theewaterskloof MT02 Genadendal: Water: Alien Eradication Bulk Water, 50% domestic, External Not available 3293 248000 248000 External Potable Bulk Refurb Existing small ( 6200
359 WC Theewaterskloof MT03 Genadendal: Water Mains Bulk Water, 100% domestic, Internal Not available 3293 500000 500000 Internal Bulk Refurb Existing small ( 12500
360 WC Theewaterskloof MT05 Grabouw: Water: 2Ml Reservoir Bulk Water, 100% domestic, Internal Not available 21590 2000000 2000000 Internal Bulk Refurb Existing small ( 50000



Return to the Bulk Infrastructure Project Administration Menu



Click here to go back.

Processing took 0.09 seconds.

 
[top]

Access your DWA Mail

 Access the DWA Intranet
This site is best viewed with Internet Explorer 7.0 (or newer) and Mozilla Firefox 3.0 (or newer) at 1024x768 screen resolution.
Click here to download Internet Explorer 7 or click here to download Firefox 3.

If you experience any challenges regarding this site, please contact the Webmaster.